Your machines already generate the signal. It stops at a local HMI, a controller with no network path, or a meter nobody reads. We connect it — including the equipment vendors say can't be connected — normalise it, and integrate it into the systems your business runs on.
Two connected layers. Downwards: connecting PLCs, SCADA systems, sensors, meters and instruments through edge gateways, then normalising heterogeneous protocols into one consistent data structure. Upwards: integrating that structured floor data into ERP, MES, QMS and analytics platforms so plans and actuals reconcile automatically. It includes retrofit sensing for legacy assets that have no digital output at all.
Signal path — from controller to decision
We walk the plant and inventory what each machine can actually expose — controller make and model, available ports, existing network path, whether the OEM locked the interface. Connectivity estimates made from a spreadsheet are usually wrong.
A stop event on its own is a number. A stop event tied to the shift, the operator, the product, the tool and the last maintenance action is a diagnosis. We design the data model so signals arrive already connected to the operating context.
Heterogeneous protocols get translated into one consistent structure at the gateway rather than in every downstream application. It costs slightly more upfront and saves an enormous amount when you add the ninth machine type.
When a controller genuinely cannot be interrogated, we retrofit — current sensing on the drive, proximity or vision counting, vibration or temperature monitoring. Age of equipment changes the method, not the outcome.
Systems get connected through a middleware and API layer with documented contracts, so replacing one system later doesn't unpick the other six.
Indicative rather than exhaustive — the specific list is validated per site during the connectivity survey.
Physical and logical connection from the asset to a normalised data stream.
Instrumenting assets that expose nothing digitally.
Connecting the floor to the systems the business already runs on.
| Model | Scope | Typical duration |
|---|---|---|
| Connectivity Survey | Asset-by-asset assessment of what can be connected, how, and at what cost. Standalone deliverable. | 1–2 weeks |
| Pilot Connection | A representative set of machines connected end to end, proving the approach before scale. | 3–6 weeks |
| Plant Connectivity Programme | Full machine and utility connectivity across the site, with normalisation and integration. | 2–6 months |
| Integration Programme | Enterprise integration layer connecting floor, ERP, MES, QMS and analytics. | 2–5 months |
Turn connected signal into workflows, alerts and reviews.
Explore →Build the data platform and models on top of the connected estate.
Explore →Decide what's worth connecting before you connect it.
Explore →A fixed-scope engagement. We walk your floor, map where data breaks down, and hand you a costed roadmap — whether or not you build any of it with us.