C05 — Adoption, Support & Scale

Go-live is the midpoint, not the finish line.

The most common ending for a manufacturing digitisation programme isn't failure — it's a system that technically works and nobody uses. We treat adoption as a designed workstream, prove the numbers actually moved, support the thing afterwards, and build the playbook that gets you from one plant to all of them.

The straight answer

Why does adoption need its own workstream?

Because the reasons these programmes fail are rarely technical. Executive sponsorship fades once the pilot budget ends; supervisors keep the parallel spreadsheet because it's faster; nobody proves the business case actually landed, so funding for phase two never appears. Adoption work addresses all three: redesigning daily management routines around the system, training and supporting frontline users properly, and tracking benefit realisation with the same rigour as the build.

When this is relevant

You probably need this if…

  • You have a system that went live and usage has quietly declined since.
  • Supervisors are still keeping a parallel spreadsheet “just in case”.
  • You can't prove the last investment paid back, so the next one is hard to fund.
  • One plant is running well and the other six haven't started.
  • Your original implementation partner has finished and disappeared.
  • Every site is customising differently and you're losing comparability.
What we fix

Problems we address

  • Training delivered once at go-live and never again as people rotate.
  • Daily management routines that still run off the old report, so the new system is extra work.
  • Benefits claimed in the business case and never measured afterwards.
  • Systems that decay because nobody owns enhancement after the project closes.
  • Rollouts restarted from scratch at each site rather than templated.
  • Local customisation so extensive that cross-plant comparison becomes meaningless.
Our approach

How we work through it.

  1. Redesign the routine, not just the tool

    If the morning meeting still runs off the old spreadsheet, the new system is additional work and will be abandoned. We redesign the daily management routine so the system is the path of least resistance rather than a parallel obligation.

  2. Train the supervisor before the operator

    Supervisors decide whether a system lives or dies. If the shift-in-charge isn't fluent and convinced, no amount of operator training compensates.

  3. Measure adoption as a metric

    Completion rates, capture latency, override frequency and parallel-record usage are tracked and reviewed. Declining adoption is a leading indicator of failure and it is visible months before anyone says so out loud.

  4. Prove the benefit in their numbers

    We baseline before go-live and measure after, in the same units the business case used. Where the number didn't move, we say so and investigate — a programme that can't be honest about its own results can't be trusted about the next phase.

  5. Template before you replicate

    The second site is where you decide what is standard and what is legitimately local. Getting that boundary right is the difference between a rollout and eight separate projects.

Scope of work

What sits inside C05.

C05.01

Adoption Diagnostics

Finding out whether the system is genuinely being used, and where it isn't.

  • Usage and completion analytics
  • Parallel-record detection
  • Frontline interviews and observation
  • Friction point analysis
  • Adoption risk scoring
C05.02

Change Management

The organisational work that makes a technical change stick.

  • Stakeholder and resistance mapping
  • Communication planning
  • Champion and super-user programmes
  • Role and responsibility redesign
  • Leadership alignment sessions
C05.03

Training & Enablement

Building capability that survives shift rotation and turnover.

  • Operator and supervisor training
  • Train-the-trainer programmes
  • Role-based documentation and SOPs
  • Refresher and onboarding material
  • Multi-language and low-literacy formats
C05.04

Daily Management Redesign

Rebuilding the operating rhythm around the new system.

  • Shift handover redesign
  • Daily and weekly review structure
  • Escalation and accountability model
  • Tiered meeting cadence
  • Visual management standards
C05.05

Benefit Realisation

Proving what actually changed, with the same rigour as the build.

  • Pre-go-live baselining
  • Post-implementation measurement
  • Variance analysis against the business case
  • Leadership reporting
  • Corrective recommendations
C05.06

Managed Support

Keeping the system healthy and improving after we hand over.

  • Application support with defined SLAs
  • System monitoring and health checks
  • Enhancement releases
  • Platform and version upgrades
  • Named support engineers
C05.07

Multi-Site Rollout

Getting past the first plant without restarting each time.

  • Rollout playbook and templates
  • Site readiness assessment
  • Standard vs. local governance
  • Deployment sequencing
  • Cross-site benchmarking
C05.08

Programme Recovery

Restarting something that stalled — including work we didn't do.

  • Root cause assessment of the stall
  • Salvage vs. restart analysis
  • Re-scoping and re-sequencing
  • Stakeholder re-engagement
  • Completion programme
C05.09

Capability Transfer

Making your team self-sufficient rather than dependent on us.

  • Internal admin and configuration training
  • Documentation handover
  • Knowledge transfer sessions
  • Internal support model design
  • Capability and hiring guidance
Deliverables

What you get

  • An adoption plan with named owners, measured against usage data.
  • Trained supervisors, operators and internal super-users.
  • Redesigned shift handover and daily management routines.
  • A benefit realisation report comparing measured results to the business case.
  • A support agreement with defined response and resolution commitments.
  • A rollout playbook templated for the remaining sites.
  • Full documentation and capability transfer to your internal team.
Outcomes

What changes

  • The system becomes the way work is done, not an extra thing to update.
  • Usage holds steady after go-live instead of quietly declining.
  • You can prove what the last investment returned, which makes the next one fundable.
  • The second site takes a fraction of the time the first one did.
  • Cross-plant comparison stays meaningful because the standard held.
  • Your team can configure, extend and support the system without us.
Engagement

How we partner on this.

ModelScopeTypical duration
Adoption SprintDiagnostic and intervention on a live system where usage is declining.3–6 weeks
Change & Enablement WorkstreamRuns alongside a build programme from design through to post-go-live stabilisation.Duration of build
Orbit CareOngoing managed support, monitoring, enhancements and upgrades.Annual retainer
Multi-Site Rollout ProgrammeTemplated deployment across the plant network with central governance.6–24 months
Programme RecoveryAssessment and completion of a stalled implementation, including third-party work.Variable
Questions

Frequently asked

Yes, and it's a meaningful share of what we do. We assess what was built, what's salvageable and what it would take to finish or replace it. We're not precious about the origin — recovering a half-finished implementation is usually cheaper for you than starting again, and we'll tell you when it isn't.
Through usage data rather than opinion: workflow completion rates, time between event and capture, override and exception frequency, and evidence of parallel records still being kept. Those four indicators tell you the truth several months before anyone admits the system isn't working.
Usually, and the resistance is usually rational. Operators reject systems that are slower than what they replaced, that create work with no visible benefit to them, or that feel like surveillance. Each of those is a design problem with a design fix. What doesn't work is treating it as an attitude problem to be trained away.
Defined response and resolution SLAs, monitoring and health checks, bug fixes, an agreed allocation of enhancement work, and platform upgrades. It's deliberately structured so the system keeps improving rather than freezing at go-live and decaying into another legacy tool.
The rule we use: standardise the data model, the KPI definitions and the escalation logic; allow local variation in workflow steps, approval chains and terminology. If sites can define OEE differently, cross-plant comparison is theatre. If they can't adjust their own approval chain, they'll build a workaround.